Terms and Conditions
Excavating, de-watering, shoring, and/or scaffolding of job area, all of which must comply with OSHA standards.  Scheduling inspectors and obtaining permits as necessary. Providing materials unless written arrangements were made previously. Installing materials unless written arrangements were made previously. Testing of anything other than pressure on the valve and sleeve unless written arrangements were made previously. ie: Line Pressure testing and Backflow Preventer testing is a separate and additional charge.

Lifting services if necessary. 
Labor assistance of  1 man to be supervised if required. Concrete support for the Tapping Sleeve if required. Concrete support for the Tapping Valve if required.
O.D. measurements prior to scheduling. 
Pipe wall thickness prior to scheduling. Plastic, PVC, HDPE pipes and Asbestos Cement pipe are brittle and become more so over time, cracking, splitting, breaking or damage of pipe for any reason we are not responsible for.

PLEASE READ THESE TERMS CAREFULLY BEFORE USING THIS SITE

THTT provides third-party links for your convenience only, and is not responsible for the content of any site linked to or from the website. THTT does not analyze, endorse or approve third-party websites. When you link to websites other than www.toddhthomas.com, even though it contains the name, please note that it is separate from THTT, and that THTT has no oversight of the content on that website.

Downloading digital content is done at your own risk. THTT is not responsible for damages of any device or fiscal losses affected.

THTT may make improvements and/or changes, information, services or prices described on this site at anytime without notice.

By accessing and using this website, you agree to all terms listed above.



Copyright 2014
Todd H Thomas Taps
All Rights Reserved

                                    Home     |     Terms and Conditions     |     Contact THTT